Skip to main content

Shinhotaka Onsen Route (Washiba-dake)

Washiba-dake (2924m)

Shinhotaka Onsen Route is a route on Washiba-dake covering 22.00 km with 1900 meters of elevation gain. The estimated duration is 12.0 hours.

Difficulty
2
Distance
22.00 km
Elevation Gain
1900 m
Duration
12.0h
Loop
No

Description

Shinhotaka Onsen Route on Washiba-dake: 22.0km, 1900m gain. Grade 2/5. Moderate trek. Sustained 1900m climb rewards with panoramic summit views; allow 5-6hr.

Mountain Contour